Custom Machinery · Foundry Equipment · Parts & Service
p. 866-635-5874
f. 260.747.4990
News & Events
Category: Search News:  
Start:     End:        
7/21/2009 Aerator Brushes IN STOCK
States Engineering has Aerator brushes in stock ready for delivery.
7/21/2009 IN STOCK - Rebuilt M-2500 Batch Ringmullor with Controls
States Engineering has a Rebuilt M-2500 Batch Ringmullor with Reconditioned Allen Bradley SLC500 Controls with Touch Screen. IN STOCK for immediate delivery. BARGIN PRICE!! Contact us for details.
7/20/2009 Bargin Prices
States has several bearings, bushings, pulleys, and more at BARGIN Prices.
4/14/2009 March 2009 Steel Report
Aluminum The Austrailian Government is weighing China’s planned 19.5 Billion dollar investment in mining giant Rio Tinto. It would boost China’s equity in Rio Tinto to 18% Carbon Flat Roll USS has announced further plans to consolidate by temporarily idling 2 facilities in Ontario, and moving the work to Mon Valley Works, Gary Works, and Fairfield Works Stainless Steel Outukompu is set to raise its production of plate at its New Castle, IN facility from 50000 tpy to 70000 tpy
3/3/2009 February Steel
Aluminum *Aleris International has filed for Chapter 11 Bankruptcy protection. They have received a DIP, and secured a credit line that will get them through the end of 2009. Aleris is saying that it will be business as usual, there international companies were not included in this filing Carbon Steel- Flat *Domestic Mills continue to operate at below 50% capacity, with some mills operating at 40% or below Stainless Steel *Surcharges for 304 and 316 are down in February, but will rise minimally in March
1/12/2009 December Steel Report
Aluminum * Lead Times are 6-8 Weeks for Common Alloy * China’s Aluminum Production has fallen 2.8% YTD * Aluminum Inventories continue to grow on the LME * Ingot has been as low of .69/lb, but has picked up recently, and is now is the low 70’s Carbon Steel Flat * US Steel, Mittal, Algoma, and Severstall have all announced cut backs in production * Capacity of the Mills are at 50.2%, down from the high 80’s this year * Two-thirds of the Blast furnaces in the US are idled * Lead times are still short, but with production cut backs, they are moving out quickly Stainless Steel * Surcharges continue to drop * Lead times are 3-4 Weeks for Coil * Major Producers in the mining of Nickel, have announced major cut backs * Pricing in 2009 could rise a bit due to the current restocking
Page: 1 of 1